Turf installation by big rolls
This method is very fast, the installation being done with modern and professional equipment, a standard size football field can be renovated (removal of the old surface, leveling of the substrate, turf installation) and ready to play in about 7 days.
In order for the success of the work to be guaranteed, the quality of the turf to be installed is very important, and it must meet certain criteria.
Turf installation by sowing
This method is a long one, the soil can be used about 2-3 months after sowing. During this period, the pitch requires much more careful maintenance, being at a time when it has an increased sensitivity and a much higher set of needs.
The costs of setting up this method are significantly lower than those of installing turf rolls directly.